• The Bakaru and Bilibili hydro power plants of PLN play a critical role for eastern Indonesia. But there was a lack of proper cable sealing in walls and floors.

  • Rats, snakes and rain water caused risks of short-circuit, downtime and repair works.

  • Roxtec seals were installed around existing cables to secure cable entries, ensure operational reliability, and prepare for future upgrades.

  • “Roxtec seals significantly contribute to the seamless operation of power generation.” Machnizon Masri, Head Manager – Power Generation, PT PLN South, West and South West Sulawesi.